LifecycleStage
enumerationLifecycle Stage
Controlled list of EN 15804 lifecycle modules (product, construction, use, end-of-life, and benefits beyond the system boundary).
Values (17)
| Value | Description |
|---|---|
| StageA1 A1 Raw material supply | A1 Raw material supply |
| StageA2 A2 Transport to manufacturer | A2 Transport to manufacturer |
| StageA3 A3 Manufacturing | A3 Manufacturing |
| StageA4 A4 Transport to site | A4 Transport to site |
| StageA5 A5 Installation | A5 Installation |
| StageB1 B1 Use | B1 Use |
| StageB2 B2 Maintenance | B2 Maintenance |
| StageB3 B3 Repair | B3 Repair |
| StageB4 B4 Replacement | B4 Replacement |
| StageB5 B5 Refurbishment | B5 Refurbishment |
| StageB6 B6 Operational energy use | B6 Operational energy use |
| StageB7 B7 Operational water use | B7 Operational water use |
| StageC1 C1 Deconstruction / demolition | C1 Deconstruction / demolition |
| StageC2 C2 Transport to waste processing | C2 Transport to waste processing |
| StageC3 C3 Waste processing | C3 Waste processing |
| StageC4 C4 Disposal | C4 Disposal |
| StageD D Benefits and loads beyond the system boundary | D Benefits and loads beyond the system boundary |